ReferenceGuides / 3d Printing
English
Player guides / Planning

3D printing: blueprints, modules and real costs

Use the blueprint’s actual inputs and prerequisites, calculate complete powered cycles and separate production margin from money recovered through sales.

At a glance

Use the blueprint’s actual inputs and prerequisites, calculate complete powered cycles and separate production margin from money recovered through sales.

Shop storage and equipment in the Probably Stolen inventory
Stock and equipment
  1. 1Inspect or measure
  2. 2Use the calculator
  3. 3Check the result
On this page

Plan one fixed printer setup#

The 24-record catalog separates each reusable chip from the materials consumed for each batch. A chip’s initial purchase is an investment, not a recurring material cost. Adequate input stock, a suitable power source and room for completed products remain your responsibility.

The printing planner assumes one complete powered processing cycle each night, a compatible configuration that fits, and no equipment changes, overload or damage. They do not reproduce bay geometry or the game’s whole overnight sequence.

Use printer-specific integer steps#

The adopted community model uses 24 + trunc(24P/100) progress per cycle and max(1, 8 − trunc(8E/100)) kJ per cycle. The base job needing 50 work takes three 24-work cycles. One +16 Performance module gives 27 work per cycle and two cycles.

Required work is rounded up to a full number of cycles. Extra progress is not carried into a new batch. A setup with no positive progress cannot finish; missing a blueprint’s required module also prevents a valid production estimate.

Reviewed blueprint catalog#

Module requirements are specific to the blueprint. Metal inputs alone do not establish a Metal Printer requirement. The empty small bottle remains a container, not a bottle filled with saleable water.

Gun Parts output depends on the consumed ingot’s true purity. Melee output can increase with its dedicated module, but its quality is not a fixed sale quote. Frames and quality-sensitive goods need an actual final unit price in the profit planner.

Scroll sideways to see all columns.

Fixed-configuration community references; base quotes are not final sale guarantees
BlueprintWorkBase fixtureRequired moduleQuote scope
.22 Pistol 3D Printer ChipSource 1Source 2503 cycles / 24 kJNone40 cr reference
3D Printer Chip (x2 .22 Pistol)Source 1Source 2603 cycles / 24 kJNone40 cr reference
3D Printer Chip (x4 Makeshift RDS)Source 1Source 2201 cycles / 8 kJNone25 cr reference
3D Printer Chip (x4 Toy Laser Pointer)Source 1Source 2201 cycles / 8 kJNone18 cr reference
3D Printer Chip (x6 Small Plastic Bottle)Source 1Source 2101 cycles / 8 kJNone4 cr reference
3D Printer Chip (x4 Improved Internal Springs)Source 1Source 2201 cycles / 8 kJNone20 cr reference
3D Printer Chip (x2 RDS)Source 1Source 2241 cycles / 8 kJNone60 cr reference
3D Printer Chip (x2 Laser Sight)Source 1Source 2241 cycles / 8 kJNone50 cr reference
3D Printer Chip (x2 Silencer)Source 1Source 2241 cycles / 8 kJNone55 cr reference
3D Printer Chip (x2 .22 Magazine)Source 1Source 2241 cycles / 8 kJNone15 cr reference
3D Printer Chip (x2 Ext. .22 Mag.)Source 1Source 2482 cycles / 16 kJNone35 cr reference
3D Printer Chip (x2 High Cap. .22 Mag.)Source 1Source 2362 cycles / 16 kJNone25 cr reference
3D Printer Chip (x2 10MM Magazine)Source 1Source 2362 cycles / 24 kJMetal30 cr reference
3D Printer Chip (x1 Ext. 10MM Mag.)Source 1Source 2603 cycles / 36 kJMetal50 cr reference
3D Printer Chip (x1 High Cap. 10MM Mag.)Source 1Source 2482 cycles / 24 kJMetal40 cr reference
Nestfire Compact Frame 3D Printer ChipSource 1Source 2604 cycles / 56 kJMetal + CNCMeasured quote needed
Ironcraft 10 Frame 3D Printer ChipSource 1Source 2704 cycles / 56 kJMetal + CNCMeasured quote needed
Gun Part 3D Printer ChipSource 1Source 2302 cycles / 28 kJMetal + CNC25 cr reference
3D Printer Chip (x3 Box Cutter)Source 1Source 2342 cycles / 16 kJNoneMeasured quote needed
3D Printer Chip (x4 Kitchen Knife)Source 1Source 2643 cycles / 24 kJNoneMeasured quote needed
3D Printer Chip (x4 Hatchet)Source 1Source 2754 cycles / 32 kJNoneMeasured quote needed
3D Printer Chip (x4 Meat Cleaver)Source 1Source 2824 cycles / 32 kJNoneMeasured quote needed
3D Printer Chip (x5 Combat Knife)Source 1Source 2985 cycles / 60 kJMetalMeasured quote needed
3D Printer Chip (x3 Combat Machete)Source 1Source 21205 cycles / 60 kJMetalMeasured quote needed

Read the cost layers#

Material margin subtracts only per-batch materials from the expected sale proceeds. Energy-adjusted profit also subtracts the powered cycle demand multiplied by your credits-per-kJ assumption. A blank unknown cost is different from a free input entered as zero.

Printer, chip and module investment is recovered through sold batches. The payback figure assumes the same conditions repeat and that each batch can be funded. A negative or unknown margin cannot establish payback.

Production is not a sale#

The planned-run finish time covers production only. The optional sale scenario starts after all planned production and then sells the stated number of units per night. It is intentionally sequential and does not simulate customer arrivals.

Check the blueprint comparison as a production scenario, not a promise that the highest-ranked product will sell immediately. Actual final sale quotes override the reference adjustment only for the selected product.

Reference notes

Sources

Reviewed Nov 14, 2026